top of page
info@aplisglobal.com | +1 (647) 360 5545 | PORTAL ACCESS


Build Smart: Why Most TI Projects Go Over Budget (and the Fix)
Where Predictability Breaks Down in Controlled Spaces Tenant Improvement (TI) projects are often assumed to be the most predictable category of construction. The space already exists, the scope is defined early, and budgets are typically negotiated in advance. On the surface, this creates the impression of control. Yet TI projects consistently overrun budgets across markets and asset types. The cause is rarely dramatic. Instead, it is a gradual breakdown in alignment between

Harrison Whitfield
Apr 203 min read
bottom of page
